Design Master Wish List
Welcome to the Design Master Wish List, where you can submit your ideas for improvements to the software.
367 results found
-
Edit multiple rooms
Add a command to allow you to edit the settings on multiple rooms at a time.
10 votes -
Load Type Schedule Designation
Add a distribution schedule customization attribute that can be added to panel schedules as an additional column to show load type(s) that are connected to each circuit, preferably letter abbreviation designations for each load type. (Heating would be 'H', Lighting would be 'L', Motor loads 'M' etc...)
9 votes -
ComCheck Export For Revit
I would like to export from Revit to import into ComCheck similar to the AutoCAD version of Design Master Electrical
9 votes -
Support Paralleled Generators Connected to Switchboard
DM does not currently support more than one source on the Normal side of an ATS or the EM side of ATS, however larger I-2, I-3 occupancies generally have paralleled generators connected to a switchboard. This feature would avoid cumbersome work arounds.
9 votes -
Transfer Grilles for Air Balance Report
Add a transfer grille option for return air so that you can use the balance report function on projects which use transfer grilles.
9 votes -
Adding Further Pipe Symbols
All of these symbols came up on one particular project, please leave comments on common plumbing symbols that I may have missed. Adding in these symbols and the corresponding isometric representations would greatly reduce the amount of time required to create each one of them by hand on both models. The following are the symbols that I found would be useful additions:
- Mixing valves
- Water heaters
- Grease interceptor
- Sample wells for grease interceptors
- Cleanout
- Cleanout to grade
- Two-way cleanout
- Backflow preventer
- Water filter
9 votes -
Total Load in Project
Please add capability to total loads for the project before the circuiting is complete.
I would like to have a load sheet that keeps track of the total project load.
What I use now is a modified panel shedule that only shows the loads for a dummy panel I create called service. I connect all the panels together and then to Service. This gives me a total load analysis for the project, but only after the design is complete. I need to be able to confirm my loads and service sizing at the design development stage before circuiting.
A consideration…
9 votes -
Export the luminaire schedule into excel
I have lighting reps ask me all the time for an excel spreadsheet of our luminaire schedule. It would be helpful to export our luminaire schedule into excel.
9 votes -
Metric
Support drawings with metric base units.
9 votes -
Customization of circuiting callouts
In circuiting callouts, allow the dash to be replaced by a custom string.
Example: Default circuiting callout is L1A-1,3,5. Allow us to make it say L1A: 1,3,5 or L1A CKT 1,3,5.
8 votes -
Indoor point-by-point calculations
Add indoor point-by-point lighting calculations.
8 votes -
Swap circuits in Revit
Be able to swap circuits in Revit like you can using the "Move Circuit" command in DM Electrical for AutoCAD.
8 votes -
Demolition Layer Devices
I do not feel that the schedules should show counts for devices like receptacles and computer outlets that are on a demolition layer.
8 votes -
8 votes
-
One-Line Distribution Equipment "Wrapping". For printability
Often times MCC's have so many loads on them that once they are generated as a One-Line, they are too long and can no longer be printed without truncating off most of the loads for printing.
The current recommended solution is to divide the loads into MCC sections and then to connect them as sub-feeds to the parent MCC. This solution is convoluted and not easily scalable. True support of this fundamental need is requested.
I request a dedicated wrapping functionality that allows the user to select where on distribution equipment the user would like for the distribution equipment to…
7 votes -
Be able to create a panel schedule for existing loads not in model
I do a lot of remodel work and it would be nice to be able to fill out a panel schedule with existing load data from a hard copy of an existing panel schedule without have to actually put the loads in the model and then circuiting them.
7 votesI won’t say never, but this feature would be quite difficult currently. We let Revit handle all the loads in the project. It really needs to be handled by Autodesk directly rather than by us.
-
Multi text search
implement Multi-Text search through out the menus.
So for example when searching through the Insert Receptacle menu and in my case we have several thousand pieces of equipment. if the equipment is called 'RX99S' instead of just allowing us to hit 'R' and starting us off at the beginning of the list of 'R' equipment allow us to type out 'RX99S' and design master go straight to the piece of equipment. this is a very simple change to the code in design master and would save tons of time on projects.
7 votes -
Add horsepower of individual loads on mcc schedules
The MCC schedule doesn't have the ability to show horsepower values for the individual loads. This is important information for the MCC vendor for breaker and overload sizing.
7 votes -
Populate MCC Information Based upon Equipment
The motor control center schedule includes several fields that could be populated from the information entered into the equipment connection devices. These include:
Disconnect fuse size
Starter NEMA size
Starter type (ie, starter description)However, these fields do not populate automatically when the equipment connection devices are circuited to the motor control center. Is there a way to make the motor control center fields automatically pick this information from the equipment connection devices when they are circuited to a motor control center? Is there a way to override automatically populating the starter information into the motor control center when the…
7 votes -
7 votes
- Don't see your idea?