Skip to content

Design Master Wish List

Welcome to the Design Master Wish List, where you can submit your ideas for improvements to the software.

You can also browse ideas other users have submitted. The more comments, votes, and subscriptions we see for a feature, the more likely we are to implement it.



  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

346 results found

  1. Link to PDF File

    In the various DM schedules (light fixtures, receptacles, diffuser, etc), add the option to link the entry to a PDF file. The PDF could be opened from the schedule, or there could be an option to include it as a hyperlink on the device so it can be opened from the AutoCAD drawing.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Excel Add In

    Can we change the way that the low voltage devices, switches, and equipment are handled so that they can be exported in the same manner as the light fixtures and receptacles?

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Keep Tick Marks on Broken Circuits

    When a circuit is broken, keep tick marks inserted on one of the halves.

    9 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Equipment Circuit Length in Schedule

    Add new column to the equipment schedule that would display the length of the branch circuit.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Display Equipment Disconnect Ratings on Drawing

    Display the rating of the disconnect and the rating of the fused on the drawing adjacent to the disconnect symbol.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Aim Lamps Separately for Emergency Fixtures

    For fixtures used in the outdoor and egress point-by-point photometrics with two lamps, we need to aim the lamp independently for correct photometrics.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. add multiple pipe label options

    Three options: One for system type and size, one for just size, and one for just system type.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Rotate Equipment ID Tags

    Presently the equipment ID tag reverts to "world" orientation whenever it is moved or when you coordinate data base. Please make it subject to rotate text command, such that it stays in the orientation selected.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Make schedules sortable by different fields

    Be able to sort schedules by different fields instead of just the default field.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Update Pipe Breaks on Save or Open

    When inserting fittings or piping the software will go through a regeneration process after each item is inserted. When files are small this is not a big deal. On large projects there is a noticeable delay and the software zooms out to the extents and then back into the area you are working on. Rather than do this on every change, include an option to only do this when the drawing is saved (and possibly when the drawing is opened).

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Copy and Increment Across Drawings

    Improve the "Copy and Increment" command to work across drawings. Make it easier to move everything from one panel to a different panel on the copied devices.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Add an attribute for panel schedule

    Add an attribute that adds the odd circuit and the even circuit in a panel schedule, i.e. circuits 1 & 2, circuits 3 & 4, etc., and be able to put that attribute in the phase block of the panel schedule.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Show conduit runs with schedules

    Be able to show conduits feeder runs on their own layer with up and down riser symbols. Then be able to create a conduit schedule.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Fault in Equipment Schedule

    Add a column to the equipment schedule to show the available fault.

    Currently equipment fault can only be seen in the full fault schedule for the entire project.

    0 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Prompt to Load DM

    Add a prompt before loading any DM information into a project. Would be useful when you do NOT want DM loaded in a specific Revit project.

    At the project level, would save your response so that you are only prompted once.

    At the user level, would have an option to disable the prompt so DM is automatically loaded in all projects like it currently is for customers who prefer that workflow.

    0 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Update the Excel Add-in to work in Recent Version of Excel

    The Excel Add-in is two pieces: functions in Excel for pulling information from the DM database, and a set of pulldown menus and dialog boxes for inserting these functions.

    The functions still work and can be used manually.

    The pulldown menus and dialog boxes no longer work in newer versions of Excel.

    This wish list item is for us to fix the menus and dialog boxes to work again.

    0 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Size ground and isolated ground separately

    Add an option to the isolated ground to size it to a specific value. Currently it is an on/off toggle and sized to match the ground wire.

    0 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Set Selective Coordination Graph Voltage

    Add an option to set the voltage that selective coordination graphs use for their display.

    Currently the voltage is set based on the voltage of the majority of equipment displayed on the graph.

    0 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Selective Coordination Graph: Fault Options

    The fault labels are currently displayed automatically at the top of the selective coordination graphs.

    Add an option to display the fault at the top (current functionality), at the bottom (current label would move to the top of the graph), or remove them.

    0 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Selective Coordination Graph: Set minimum time

    Be able to set the minimum time for selective coordination graphs. Currently it is fixed at 0.01. We could add an option to set it at 0.1 or 0.01. Or add an option to set it at a specific value.

    We are leaning toward implementing it as a 0.1 or 0.01 option. If you would like it as a custom value, indicate that in the comments.

    0 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Design Master Wish List

Categories

Feedback and Knowledge Base