New / Existing Pipe Connection Graphics
When connecting a new waste pipe to an existing pipe, draw the chamfer between the two using the new layer system (not the existing layer system as it currently does).
4
votes
AdminDavid Robison
(President, Design Master Software)
shared this idea
-
Mosby West commented
Realizing this is only used for remodels or, as in my case, for tenant fit-up design in shell buildings.
-
The current workaround for this is to add breaks to the existing pipe before and after the branch, then change that small section to new.