Skip to content

Design Master Wish List

Welcome to the Design Master Wish List, where you can submit your ideas for improvements to the software.

You can also browse ideas other users have submitted. The more comments, votes, and subscriptions we see for a feature, the more likely we are to implement it.



  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

367 results found

  1. Track which panel schedules are inserted on drawings

    Keep track of which panel schedules are inserted on all the drawings in a project. Be able to check and confirm there is a schedule inserted for each drawing on a project.

    The goal for this feature is quality control on large projects as panels are added and deleted.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Recurring Low Voltage Panel

    Create recurring low voltage panels that work like standard recurring panels.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Photovoltaic Design

    Add features to support PV design, such as inverters, combiners, and a string calculator.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Per-Circuit Wire Callout Option

    Be able to enable or disable the wire callout on a homerun on a circuit-by-circuit basis.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. 18 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Export to eQuest or DOE2.2

    Be able to export building load information to eQuest or DOE2.2 using gbXML for energy modeling purposes, such as ASHRAE 90.1, LEED, and Title 24.

    15 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. 118 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Before & After Model

    Develop a simple way to build and manage a "before" and "after" model of an electrical distribution system for renovation and build-out projects.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Ability to differentiate diffuser of different systems in the diffuser schedule

    Ability to differentiate diffuser of different systems in the diffuser schedule. i.e. turn on or off diffusers associated with New, existing and demo systems.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Add a "match circuit" command.

    Make the "Select Circuit from Drawing <" button a command that can be typed into the command line. After this command has been run, do not show the Circuiting window, instead go immediately to "Circuit Devices <". The user can then continue to circuit additional devices to the circuit they selected. A double right click would bring up the Circuiting window or the user could escape out of the command without showing the window.

    17 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Default elevations for all electrical devices

    You can specific a default elevation for light fixtures in the schedule. Expand this functionality to all types of electrical devices.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Annotation Scaling / Multiple Scales on a Single Drawing

    Add support for annotative scale factors for blocks and text. This would allow blocks and text to be the same size in different scaled viewports.

    93 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Unique ID for all Feeders and Branch Circuits

    Have a way to make a unique cable ID for every feeder, branch circuit and low voltage circuit. For example P-MCC1-001 for the power cable fed from MCC1 or PT-FLOWGAS-003 for a pressure transmitter.

    I'm working on a big industrial plant where I need a have a cable number for every cable in the plant.

    I would like to have the ID on the one line, plan view drawing and export to Excel.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Upsize Wires Based upon Voltage Drop

    Automatically upsize branch circuit wires when necessary because of voltage drop.

    77 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Provide Weight or Area of Ducts in Takeoffs

    Weight of ducts in HVAC Takeoffs provide a very simple way to estimate cost of projects.

    Or, add an option to calculate square feet of sheet metal ductwork.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Count devices connected to recurring panels

    Have schedule quantities and takeoffs count the number of items connected to recurring panels.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. SKM Power Tools

    Provide the ability to import and export panel schedules and switchboard schedules between Design Master and SKM PowerTools for Windows.

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Use commas or spaces to separate voltage, #poles, #wires ect for equipment callouts

    Currently information on the equipment call out is all grouped together without separation. We have had this requested several times by our clients who would like this changed on our drawings. To currently meet this request we are spending to much time adjusting these individually.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Add the ability to create plan notes

    If you could add the ability to create plan or keynotes to all devices and fixtures, you could eliminate some of the notes that occupy space beside them. Typically a hex box, circle would have the keynote number in it, which would refer you to a common list of notes on the edge of the space. Keeping them tied to the respective annotation layers may help keep them sortable by the entities on that sheet.

    21 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Locate and edit schedules within groups to create T.I. voltage drop and other schedules that don't include the entire project.

    When there is T.I. work within a large project you want to show only the the voltage drop for the TI space. You have to deselect all the equipment not in the space one at a time to show a voltage drop schedule for just the TI work. What if you could group the panels in a similar way to luminaires so that the TI voltage drop or fault schedule has only the TI panels, without disabling the ability to show a schedule for the main project or another TI within that project.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Design Master Wish List

Categories

Feedback and Knowledge Base