Skip to content

Design Master Wish List

Welcome to the Design Master Wish List, where you can submit your ideas for improvements to the software.

You can also browse ideas other users have submitted. The more comments, votes, and subscriptions we see for a feature, the more likely we are to implement it.



  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

191 results found

  1. Device Count

    I have noticed that when equipment connections use receptacles or toggle switches, these devices are not included in the device count on the respective device schedules. Can DM be modified to included these devices in the count? This issue has created some confusion on some projects.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Before & After Model

    Develop a simple way to build and manage a "before" and "after" model of an electrical distribution system for renovation and build-out projects.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Photovoltaic Design

    Add features to support PV design, such as inverters, combiners, and a string calculator.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Copy distribution panels from job to job in multi-story buildings to serve lease space panels.

    We do a lot of design work in multi-story buildings that require us to show distribution panels on one-lines with load info. Right now I have to create the DPin each job. I would like to be able to copy from job to job with existing loads.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Allow the option to add circuiting to fixture callout

    Allow the option to put the circuit number or control designation in the bottom of the fixture callout in place of the lamp info.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Edit Multiple Types of Devices

    Create an "Edit Multiple" command to works on all types of devices. Include only attributes that are common to all types of devices: layer system, elevation.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Fire Alarms

    Add better support for fire alarm system design.

    Various improvements related to this suggestion include:

    Add 12V, 14V, 16V, 18V and 24V DC device support for Fire Alarm Systems

    Change loads from KVA to mA or even VA. Two load types should be
    available, standby power and alarm power for each FA device.

    Add ability for wiring such as 24, 22, 18, 16, and 14 awg.

    Add ability to perform standby and alarm battery ampere-hour
    calculations.

    Display length, current, voltage, and voltage drop for each circuit.

    Have fire alarm panels with appropriate attributes, such as alarm time, standby time, battery…

    46 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Add a "match circuit" command.

    Make the "Select Circuit from Drawing <" button a command that can be typed into the command line. After this command has been run, do not show the Circuiting window, instead go immediately to "Circuit Devices <". The user can then continue to circuit additional devices to the circuit they selected. A double right click would bring up the Circuiting window or the user could escape out of the command without showing the window.

    17 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Make all Panel/Device selections drop downs

    Some windows allow you to choose a panel or device (receptacle, lvd, light, etc) by a drop down box. Others require you to slowly click next/previous. It would be great if all the next/previous windows were converted to the drop down box.

    I feel the benefits are pretty obvious.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Add the capability to make a note in panel schedules for special circuit breakers - HACR, SWD, etc.

    Would make sense to add a note field in the equipment connection creation form or in the circuiting form to tag individual breakers with specific requirements, possibly with a superscript which refers to a box of notes attached to the bottom of the schedule.

    93 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Circuit and Move Note in one step

    Often when circuiting I find the location DM puts the label is very poor. It would be nice if after inserting the circuit I could move the circuit text without having to stop the circuiting action, move the text, then start the circuiting action again.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Provide a default voltage for the panels in a project.

    Add a check box to set the voltage for a building. If a building is 120/240, then checking a box will set the default for panels, equipment, etc to 120/240v instead of 120/2083p4w.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. SKM Power Tools

    Provide the ability to import and export panel schedules and switchboard schedules between Design Master and SKM PowerTools for Windows.

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Excel Add In

    Can we change the way that the low voltage devices, switches, and equipment are handled so that they can be exported in the same manner as the light fixtures and receptacles?

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. 118 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Upsize Wires Based upon Voltage Drop

    Automatically upsize branch circuit wires when necessary because of voltage drop.

    77 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Display Equipment Disconnect Ratings on Drawing

    Display the rating of the disconnect and the rating of the fused on the drawing adjacent to the disconnect symbol.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Keep Tick Marks on Broken Circuits

    When a circuit is broken, keep tick marks inserted on one of the halves.

    10 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Equipment Circuit Length in Schedule

    Add new column to the equipment schedule that would display the length of the branch circuit.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Design Master Wish List

Categories

Feedback and Knowledge Base