Skip to content

Design Master Wish List

Welcome to the Design Master Wish List, where you can submit your ideas for improvements to the software.

You can also browse ideas other users have submitted. The more comments, votes, and subscriptions we see for a feature, the more likely we are to implement it.



  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

191 results found

  1. For Energy Code compliance, the light Fixture Schedule should include a subtotal of watts for each fixture type, and a total of watts for al

    For Energy Code compliance, the light Fixture Schedule should include a subtotal of watts for each fixture type, and a total of watts for all the fixtures on the posted schedule. That will help expedite the Lighting Power Density calculations required for Energy Code Compliance.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. When a panel is designated as existing, the circuit descriptions (editable part in the circuiting form) start off with "EX"

    When a panel is designated as existing, the circuit descriptions (editable part in the circuiting form) start off with "EX"

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Breaker Using Twice as Many Spaces

    Many breaker panels of old and of new has the ability to put a single, two, or three pole breaker in that takes twice as many spaces as normal. Example is I have a panel I have to represent that has a 2 pole breaker that takes position 36-38 and 40-42. It also has a 3 pole breaker in it that take 24-26,28-30,32-34. I have no way of circuiting the device and still have it on phase A, B, and C.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Find Unlooped Devices

    A function similar to “Find Uncircuited” that finds elements that are circuited but have not been looped – “Find Unlooped” or something of that nature. I often am at risk of missing a dedicated receptacle or single equipment connection that I circuited, but missed when I was going through the looping/home run process.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Same equipment in multiple drawings or areas

    Right now I can put one-line devices on multiple drawings, but not equipment. Sometimes the equipment is so large such as a chiller that it needs to be seen on the site drawing at a different scale than the electrical plan view.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Selective Coordination

    Comply with NEC Article 700 requirements for selective coordination of overcurrent protective devices in the supply side of emergency system.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Set room boundaries to also be light-obstructing rectangles for photometric analysis

    It duplicates work to trace the boundaries of all rooms for energy analysis and circuit naming, then have to trace all the rooms again for photometric analysis. This would likely require the addition of a 'door' object to define places where light-obstructing boundaries would be ignored

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Error Checking

    Provide a simple error checking routine that will look at panel loads and compare them to wire sizes and ratings of upstream breakers. This could be a simple table like voltage drop and fault currents where out of range values are shown in a different font type.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Use Branch Circuit as Main Breaker for Panel

    need a way for a branch breaker to serve as the main in a panelboard and allow it to connect on the oneline

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. More MCC Stater Sizes

    Is it possible to modify the list of standard starter sizes to include VFD, Soft Switch, etc? Or even to choose 'None' and just type it in the Description field?

    I've used the ddedit command on the MCC schedule inserted into the drawing to manually modify it, but if anybody does a coordination this will be lost.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Handle LED Lighting Better

    Calculate the load based upon the length and the remote transformers.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Minimum panel clearance width

    For panels smaller than 30" width, increase the panel clearance width to 30" automatically.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Support feeder calcs for track lighting

    See NEC 220.43(B). The connected load for the branch circuit is the sum of the wattage of the connected light fixtures. The demand load is an additional 150VA per foot. I would like a place to enter the number of feet of track on a branch circuit so the demand load is calculated correctly in the load summary. We currently accomplish this through a 'Variable Caclulated Load', but it might be more intuitive if there is a 'Length Variable Demand' option. Thank you.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Multiple Switch Legs on a Single Switch

    Allow a single switch to have multiple switch legs associated with it. Currently we require a separate switch for each switch leg.

    13 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. lighting report

    Provide a check box in the Building Room dialog box to NOT include the room in the lighting report.

    I have a job where I need room names to generate the names for the receptacle circuits in the panel schedule, but don't want the rooms to show up in the Indoor Lighting Levels report.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Equipment and Receptacle Short Circuit Calculations

    Add the ability to select a checkbox for receptacles and equipment so that short circuit calculations are included for that device.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Add Sections to Panels

    Define how many breakers are in each section of panel. This would be used when creating a 84 circuit panel that is made up of 2 sections, each with 42 circuits.

    For the panel schedule, include a separator between the sections.

    When circuiting, do not allow 2 or 3 pole circuits to span the two sections.

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Number Circuits Sequentially in Panels

    Allow panels to have the circuits in them numbered sequentially, rather than split odd and even.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. More options for panel callouts, circuit labels, and homerun callouts

    Add the ability to specify a prefix or suffix for panel callouts when inserting them on the drawing. For example, be able to label them NEW PANEL 'LA' rather than simple LA.

    Also be able to replace the panel name with a different value in the circuit callout. This feature would be used when the panel name is very long.

    Also be able to leave the panel name off entirely and list just the circuit number in the homerun label. This feature would be used when there is only one panel in an area.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Export the luminaire schedule into excel

    I have lighting reps ask me all the time for an excel spreadsheet of our luminaire schedule. It would be helpful to export our luminaire schedule into excel.

    9 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Design Master Wish List

Categories

Feedback and Knowledge Base