Skip to content

Design Master Wish List

Welcome to the Design Master Wish List, where you can submit your ideas for improvements to the software.

You can also browse ideas other users have submitted. The more comments, votes, and subscriptions we see for a feature, the more likely we are to implement it.



  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

195 results found

  1. New and Existing Circuits / Breakers in Panel Schedule

    Be able to show new and existing circuits on different layers in a panel schedule. The existing circuits would be on a lighter layer and the new circuits would be on a darker layer. The rest of the schedule could be on either the new or existing layer.

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Demolition Layer Devices

    I do not feel that the schedules should show counts for devices like receptacles and computer outlets that are on a demolition layer.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Populate MCC Information Based upon Equipment

    The motor control center schedule includes several fields that could be populated from the information entered into the equipment connection devices. These include:

    Disconnect fuse size
    Starter NEMA size
    Starter type (ie, starter description)

    However, these fields do not populate automatically when the equipment connection devices are circuited to the motor control center. Is there a way to make the motor control center fields automatically pick this information from the equipment connection devices when they are circuited to a motor control center? Is there a way to override automatically populating the starter information into the motor control center when the…

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Add a hatch pattern to room definitions

    When defining rooms, it is often difficult to determine which rooms have been defined and which have not, if an area gets surrounded. Adding a hatch pattern on its own layer would make it much easier to determine if you've included all room definition areas.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Redefine Panel Schedule Blocks

    Add a command to automatically erase and reinsert panel schedules so that attribute locations are updated correctly.

    Currently, you have to manually erase the schedule, redefine the block, and reinsert the schedule.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Size Transformer Feeders Differently than Other Feeders

    Allow transformer feeders to be sized using different size wires than other feeders. In particular, this would be for sizing 800A feeders. Normal panels can use 500kcmil wires, but transformers require 600kcmil.

    (The workaround for the moment is to use 500kcmil for your 800A automatic sizing and to manually size the transformers to 600kcmil.)

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Highlight Footcandle Levels Below a Certain Level

    It would also be nice if foot candle levels less than a certain value could be a different color. This would make it easier to spot levels below a certain threshold, like fc levels for emergency egress lower limits.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Set number of spare breakers

    Add an option to require a set number of spare breakers on every panel. The other breakers in the panel would be listed as spaces.

    11 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Export Equipment List to Excel

    Export a list of equipment connections and information to a file that can be opened and viewed in Excel. The file would be for post-processing only. Any changes to the equipment would still be made using the other DM commands.

    27 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Command to Automatically Turn Photometric Layers On and Off

    It would be nice to have ribbon menu icon commands to turn the photometric layers on and off as well as automatically turn the respective layer back on after doing a recalc of either general or egress lighting.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Custom circuit description for spaces with no breakers

    Have a custom circuit description that is automatically used when the breaker size is set to "None" for a circuit.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Total Load in Project

    Please add capability to total loads for the project before the circuiting is complete.

    I would like to have a load sheet that keeps track of the total project load.

    What I use now is a modified panel shedule that only shows the loads for a dummy panel I create called service. I connect all the panels together and then to Service. This gives me a total load analysis for the project, but only after the design is complete. I need to be able to confirm my loads and service sizing at the design development stage before circuiting.

    A consideration…

    8 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Add DC

    For modeling complete solar systems.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Label homeruns with feeder IDs

    Label homeruns using feeder IDs like those used in the one-line diagram instead of full text wire callouts.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. On a one-line diagram, a vertical bus panel should have horizontal branch breakers--NOT vertical!

    When you generate a one-line diagram, if you have panels that have a vertical bus, their branch breakers end up at the bottom of the bus and are vertical. The look like main breakers--not branch breakers. A work around for this is for every vertical bus panel, generate a riser diagram starting with that panel. Even this work around is not perfect, as you have to resize the vertical bus and fiddle with the branch breaker.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Show schedule notes on last column when schedule is split

    Currently if a schedule has a "Maximum Schedule Height" set the schedule notes are placed at the bottom of the first column. It would be better to place them at the bottom of the last column (or at least have an option to place them there) since the last column is often shorter than the others.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Import single piece of equipment

    Currently, the "Import Equipment from Another Project" command imports all the equipment. Update that function to allow you to choose specific pieces of equipment to import.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Breaker Using Twice as Many Spaces

    Many breaker panels of old and of new has the ability to put a single, two, or three pole breaker in that takes twice as many spaces as normal. Example is I have a panel I have to represent that has a 2 pole breaker that takes position 36-38 and 40-42. It also has a 3 pole breaker in it that take 24-26,28-30,32-34. I have no way of circuiting the device and still have it on phase A, B, and C.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Equipment Panel Description

    In the Panel Description dropdown, add "Equipment Callout + Description" to the list, in addition to "Same as Equipment Callout" and "Custom".

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Default Groups

    Have the ability to define a default device group name. In multi-phase projects it would be helpful to be able to set a group name as the default instead of having DM go to the "General" group.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Design Master Wish List

Categories

Feedback and Knowledge Base