Design Master Wish List
Welcome to the Design Master Wish List, where you can submit your ideas for improvements to the software.
191 results found
-
Default label locations in blocks
Be able to specify locations for labels in blocks. When the labels are added to the block, they will be placed in the desired locations, rather than in the somewhat random default location they are currently placed in.
4 votes -
Connect loops to fixtures on same switch first
When inserting automatic loops, connect devices on a switch together first rather than mixing up the loops when multiple switches are on a circuit.
3 votes -
Define fixed load by phase
When defining fixed load on a panel schedule allow entry of per phase loads on two and three phase circuits in stead of lumped loads, i.e., on 2-pole circuit be able specify a load for phase A and B on any of the demand categories.
2 votes -
Support Paralleled Generators Connected to Switchboard
DM does not currently support more than one source on the Normal side of an ATS or the EM side of ATS, however larger I-2, I-3 occupancies generally have paralleled generators connected to a switchboard. This feature would avoid cumbersome work arounds.
8 votes -
Export Light Fixture Watts to Excel
Export the Energy Code Settings->Watts field from the light fixture schedule to Excel using the DM Electrical Excel Add-in.
3 votes -
Electrical Symbol Legend
Add a Schedule of all blocks used in the project. This could be used a Symbol Legend for the Project.
45 votes -
Light Fixture Settings - Different Blocks
The ability to define an egress fixture as the same fixture/block as the normal fixtures, with an option to turn a hatch on/off to differentiate. Similar to in Revit, where you can set an instance parameter and check it to turn fixtures into the egress blocks. The fixture type stays the same, only the visible block changes.
16 votes -
Do "Amps by Phase" using calculated loads on high-leg delta panels
High-leg delta panels are always unbalanced. The balanced 3-phase amps we display is not a good number to use when sizing these panels. The connected amps by phase does not account for largest motor loads or continuous loads.
Add the ability to determine the amps by phase using calculated loads. The largest motor, lighting, and continuous loads would all be calculated at 125%. All other loads would be calculated at 100%.
6 votes -
Tick marks for more than 1-pole, wire callouts for > #12
Add another option to "Homerun wire callouts and tick marks" labeled "Tick marks for more than 1-pole , wire callouts for > #12".
3 votes -
Change Voltage of Project
Be able to change voltage of a completed project for 208V to 240V and keep everything connected and circuited.
10 votes -
Add "Clear Circuit" Button Back to "Circuiting" Dialog Box
Add the "Clear Circuit" command back to the "Circuiting" dialog box. This button will set all the breaker and branch circuit sizing options back to "Size Automatically", set all the fixed loads to "0", and set the circuit descriptions to be blank.
3 votes -
Manufacturer Name field included within Notes Settings of distribution equipment
It would be helpful when creating distribution equipment lists if there was an option for the manufacturer's name. Currently we have to use an unused Note key, rename the label for that key and then remember which Notes Setting corresponds to the list entry.
1 vote -
Erase Note - multiple
Select multiple devices and delete all custom notes (not fixture callouts) attached to them.
The "Match Device Label Locations" command can add many callouts at once, but there does not seem to be a way to easily delete multiple callouts.
This would be especially useful when adding lights to a circuit that already contains lights. Running “Draw Homerun And Loops" would erase a lot of my work, so I usually delete all the circuit callouts manually before drawing loops manually.
If this feature already exists, please make it easier to find.1 vote -
Paralleling Switchgear Support
Would be very helpful to be able to be able to have multiple sources connect to the same bus. We have had numerous situations where we have had Geneva type switches, multiple kirk-key input as well as paralleling switchgear situations where we were unable to find a "work-around" using this software. This is becoming especially common with ConEdison now permitting the paralleling of electrical sources.
1 vote -
Better default panel clearances
Have better default values for panel clearances, including options to have it vary upon the panel defition.
1 vote -
New and Existing Circuits / Breakers in Panel Schedule
Be able to show new and existing circuits on different layers in a panel schedule. The existing circuits would be on a lighter layer and the new circuits would be on a darker layer. The rest of the schedule could be on either the new or existing layer.
12 votes -
Demolition Layer Devices
I do not feel that the schedules should show counts for devices like receptacles and computer outlets that are on a demolition layer.
7 votes -
Populate MCC Information Based upon Equipment
The motor control center schedule includes several fields that could be populated from the information entered into the equipment connection devices. These include:
Disconnect fuse size
Starter NEMA size
Starter type (ie, starter description)However, these fields do not populate automatically when the equipment connection devices are circuited to the motor control center. Is there a way to make the motor control center fields automatically pick this information from the equipment connection devices when they are circuited to a motor control center? Is there a way to override automatically populating the starter information into the motor control center when the…
5 votes -
Add a hatch pattern to room definitions
When defining rooms, it is often difficult to determine which rooms have been defined and which have not, if an area gets surrounded. Adding a hatch pattern on its own layer would make it much easier to determine if you've included all room definition areas.
2 votes -
Redefine Panel Schedule Blocks
Add a command to automatically erase and reinsert panel schedules so that attribute locations are updated correctly.
Currently, you have to manually erase the schedule, redefine the block, and reinsert the schedule.
1 vote
- Don't see your idea?