Skip to content

Design Master Wish List

Welcome to the Design Master Wish List, where you can submit your ideas for improvements to the software.

You can also browse ideas other users have submitted. The more comments, votes, and subscriptions we see for a feature, the more likely we are to implement it.



  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

206 results found

  1. Equipment and Receptacle Short Circuit Calculations

    Add the ability to select a checkbox for receptacles and equipment so that short circuit calculations are included for that device.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. More options for panel callouts, circuit labels, and homerun callouts

    Add the ability to specify a prefix or suffix for panel callouts when inserting them on the drawing. For example, be able to label them NEW PANEL 'LA' rather than simple LA.

    Also be able to replace the panel name with a different value in the circuit callout. This feature would be used when the panel name is very long.

    Also be able to leave the panel name off entirely and list just the circuit number in the homerun label. This feature would be used when there is only one panel in an area.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Number Circuits Sequentially in Panels

    Allow panels to have the circuits in them numbered sequentially, rather than split odd and even.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Device Count

    I have noticed that when equipment connections use receptacles or toggle switches, these devices are not included in the device count on the respective device schedules. Can DM be modified to included these devices in the count? This issue has created some confusion on some projects.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Copy distribution panels from job to job in multi-story buildings to serve lease space panels.

    We do a lot of design work in multi-story buildings that require us to show distribution panels on one-lines with load info. Right now I have to create the DPin each job. I would like to be able to copy from job to job with existing loads.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Edit Multiple Types of Devices

    Create an "Edit Multiple" command to works on all types of devices. Include only attributes that are common to all types of devices: layer system, elevation.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Allow the option to add circuiting to fixture callout

    Allow the option to put the circuit number or control designation in the bottom of the fixture callout in place of the lamp info.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Make all Panel/Device selections drop downs

    Some windows allow you to choose a panel or device (receptacle, lvd, light, etc) by a drop down box. Others require you to slowly click next/previous. It would be great if all the next/previous windows were converted to the drop down box.

    I feel the benefits are pretty obvious.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Provide a default voltage for the panels in a project.

    Add a check box to set the voltage for a building. If a building is 120/240, then checking a box will set the default for panels, equipment, etc to 120/240v instead of 120/2083p4w.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Circuit and Move Note in one step

    Often when circuiting I find the location DM puts the label is very poor. It would be nice if after inserting the circuit I could move the circuit text without having to stop the circuiting action, move the text, then start the circuiting action again.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Excel Add In

    Can we change the way that the low voltage devices, switches, and equipment are handled so that they can be exported in the same manner as the light fixtures and receptacles?

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Equipment Circuit Length in Schedule

    Add new column to the equipment schedule that would display the length of the branch circuit.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Display Equipment Disconnect Ratings on Drawing

    Display the rating of the disconnect and the rating of the fused on the drawing adjacent to the disconnect symbol.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Aim Lamps Separately for Emergency Fixtures

    For fixtures used in the outdoor and egress point-by-point photometrics with two lamps, we need to aim the lamp independently for correct photometrics.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Rotate Equipment ID Tags

    Presently the equipment ID tag reverts to "world" orientation whenever it is moved or when you coordinate data base. Please make it subject to rotate text command, such that it stays in the orientation selected.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Copy and Increment Across Drawings

    Improve the "Copy and Increment" command to work across drawings. Make it easier to move everything from one panel to a different panel on the copied devices.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Add an attribute for panel schedule

    Add an attribute that adds the odd circuit and the even circuit in a panel schedule, i.e. circuits 1 & 2, circuits 3 & 4, etc., and be able to put that attribute in the phase block of the panel schedule.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Show conduit runs with schedules

    Be able to show conduits feeder runs on their own layer with up and down riser symbols. Then be able to create a conduit schedule.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Fault in Equipment Schedule

    Add a column to the equipment schedule to show the available fault.

    Currently equipment fault can only be seen in the full fault schedule for the entire project.

    0 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?