Skip to content

Design Master Wish List

Welcome to the Design Master Wish List, where you can submit your ideas for improvements to the software.

You can also browse ideas other users have submitted. The more comments, votes, and subscriptions we see for a feature, the more likely we are to implement it.



  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

90 results found

  1. Simpler way to Change fonts in all your panel/switch box schedules

    Right now, one has to edit all the blocks of a panel schedule in order to simply change the font. There should be a way to set the preferred font for all these schedules. If there is a way, I don't know about it. When I first set up DM 10 years or so ago, I do not remember having to change every block, but it's been so long ago...

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Calculate Voltage Drop for Subset of Project

    Be able to recalculate the voltage drop for just a portion of the project when updating the schedule.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Track which panel schedules are inserted on drawings

    Keep track of which panel schedules are inserted on all the drawings in a project. Be able to check and confirm there is a schedule inserted for each drawing on a project.

    The goal for this feature is quality control on large projects as panels are added and deleted.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Recurring Low Voltage Panel

    Create recurring low voltage panels that work like standard recurring panels.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Photovoltaic Design

    Add features to support PV design, such as inverters, combiners, and a string calculator.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Per-Circuit Wire Callout Option

    Be able to enable or disable the wire callout on a homerun on a circuit-by-circuit basis.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Default elevations for all electrical devices

    You can specific a default elevation for light fixtures in the schedule. Expand this functionality to all types of electrical devices.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Upsize Wires Based upon Voltage Drop

    Automatically upsize branch circuit wires when necessary because of voltage drop.

    77 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Count devices connected to recurring panels

    Have schedule quantities and takeoffs count the number of items connected to recurring panels.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Locate and edit schedules within groups to create T.I. voltage drop and other schedules that don't include the entire project.

    When there is T.I. work within a large project you want to show only the the voltage drop for the TI space. You have to deselect all the equipment not in the space one at a time to show a voltage drop schedule for just the TI work. What if you could group the panels in a similar way to luminaires so that the TI voltage drop or fault schedule has only the TI panels, without disabling the ability to show a schedule for the main project or another TI within that project.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Arc-flash label sizes

    Be able to change the size of the arc-flash labels to fit a specific size.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Add multiple circuits to a single piece of equipment (ie. HVAC) one for each load.

    Some HVAC and other pieces of equipment require multiple circuits for multiple loads inside each unit. Currently I have to create 2 pieces of equipment with the individual loads, overlay them, then circuit them.

    29 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Improve Indoor Lighting Level Report

    Add "Allowed Watts / SF" as a field to rooms.

    Add "Allowed Watts / SF" and "Total Allowed Watts" as columns to the indoor lighting schedule.

    Add a "Totals" row at the bottom that totals the area, allowed watts, and computed watts.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Draw Circuit Loops Using Polylines instead of Arcs

    When you loop from one device to another, be able to select that loop and break it in to two loops that can each individually be moved or broke. This way we can have "S" loops.

    DM Note: When we implement this, it will probably be by allowing you to insert a loop using a pline. This will allow you to insert the loop however you want without any restrictions.

    20 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. 2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Create Separate One-Lines for Each LVD Group

    I have Security, F/A, Lighting Control Panels, Audio, and Data groups and would like to be able to create separate low voltage one-line risers for them.

    13 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Keep Tick Marks on Broken Circuits

    When a circuit is broken, keep tick marks inserted on one of the halves.

    10 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Photometric calculation schedule

    I would like to suggest that the photometric calculation schedule be a combined schedule for all rooms instead of a dedicated schedule for each single room/space (or both options be available). We are typically asked to provide a single schedule that lists the room/space name in the first column and then the various footcandle columns.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Select automatic conduit based on Type

    When selecting conduit I want to be able to select the feeder as schedule 80 so that the only size option would be based on schedule 80. Then on another feeder I could select EMT for my circuits and the only option for auto sizing would be based on EMT. Finally, I would then have the option of adding the type to my one-lines and a conduit schedule.

    11 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Lighting loads - additional options

    I like the recent addition of the general lighting loads, but there are a couple of additional things that I would like to see related to that.

    1. I think that the calculated load should include the greater of the general lighting load or the connected lighting load. The NEC states that the values for the general lighting loads are minimum values and that they may not be adequate.

    Ok, so this is probably a low priority because the NEC values are pretty conservative. With the increased adoption of energy conservation codes it becomes less likely that the connected lighting load…

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Design Master Wish List

Categories

Feedback and Knowledge Base