Fault in Equipment Schedule
Add a column to the equipment schedule to show the available fault.
Currently equipment fault can only be seen in the full fault schedule for the entire project.
                0
                 votes
              
            
 AdminDavid Robison
    (President, Design Master Software)
 shared this idea
AdminDavid Robison
    (President, Design Master Software)
 shared this idea
      
    