Welcome to the Design Master Wish List, where you can submit your ideas for improvements to the software.

You can also browse ideas other users have submitted. The more comments, votes, and subscriptions we see for a feature, the more likely we are to implement it.



  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

151 results found

  1. 5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  ElectroBIM  ·  Admin →
  2. Change Room Names from the Zone Tree or Floor Tree

    Be able to right click or slow-double-click on a room name in the Zone Tree or Floor Tree to be able to change it

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  HVAC  ·  Admin →
  3. Arc Flash Calculation

    Add arc flash calculations to Design Master Electrical.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Electrical  ·  Admin →
  4. I wish REVIT MEP would do half the things you guys do!

    I wish REVIT MEP would do half the things you guys do! Have you talked Autodesk about a joint merger or something. REVIT is what were using but it doesn't do a laundry list of things. Auto-populating panels with correct breaker sizes and wires based upon NEC and company standards. Doesn't computer AIC/Fault based upon the criteria needed. Won't let me choose what circuit I want to use. On and on! I talk to the guys around here everyday and the $840 yr compared to $5000 is kicking REVIT's Butt! Please go teach them how we Engineers and Designers really…

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    5 comments  ·  Electrical  ·  Admin →
  5. Negative Equipment Loads for Open Cases in Grocery Stores

    Grocery stores include open refrigeration cases. These loads need to be subtracted from the cooling load and added to the heating load. Using a negative equipment load works for the cooling load, but not the heating load.

    Make it so that a negative equipment load is added to the heating load.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  HVAC  ·  Admin →
  6. Add tag to feeder schedules

    by using tags on feeder schedules, you tie your predefined feeders into your one line and eliminate the busy appearance of long string of text for wire/conduit sizes on the one line. If done in the wire sizing tables it would allow common feeder combinations to be built one time and put into a feeder schedule table

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Electrical  ·  Admin →
  7. Show Panels without Lugs on One-Line Diagram

    When drawing a panel with a main breaker it shows a lug and a breaker. This causes confusion with the people we have looking at the drawings. We would prefer not to see the lug symbol so there is no confusion between panels with main lug and main breakers.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Electrical  ·  Admin →
  8. Device subscripts on schedules

    When an electrical device is created that always has a subscript(i.e. G subscript for ground fault receptacle) that subscript is not inserted with the device in the symbol column of the schedule. We have to add text to the symbol in the schedule to note the different types of receptacles. If the schedule changes the text needs to be manually updated. An option to include the subscript with the symbol would be helpful.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    3 comments  ·  Electrical  ·  Admin →
  9. Reverse Arrowheads on Return Ducts

    Make it so that arrowheads point in the direction of airflow in ducts.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  HVAC  ·  Admin →
  10. Exterior lining dimensions on plans

    Provide option to show the dimensions for the exterior lining on the duct work.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  HVAC  ·  Admin →
  11. Adjust Feeders and branch circuit sizing based on derating

    Adjust the wire size of feeders and branch circuits based on derating. This calculation needs to account for Ambient Temperature Correction Factors, Adjustment Factors and conduits on a roof (even though NEC 2017 eliminated this one). For example, there is an option in DME RT feeder sizing that asks about a double neutral. If we are acknowledging we need a double neutral, it should be understood the neutral is a current carrying conductor and should adjust the wire size and conduit size per the NEC.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  ElectroBIM  ·  Admin →
  12. Designmaster Electrical would run on Bricscad

    Thinking about Switching to Bricscad, would like for Design Master to support

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    2 comments  ·  Electrical  ·  Admin →
  13. Equipment Loads

    It would be convenient when creating equipment to enter loads using amps and let DM calculate the corresponding KVA value. Often manufacturers data includes only amperes at a given voltage and KVA must be manually calculated.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Electrical  ·  Admin →
  14. Add footnotes at the bottom of schedules, to allow common notes to be listed/identified with a char

    Add footnotes at the bottom of schedules, to allow common notes to be listed/identified with a character in the notes section. This would save typing the same notes every time and shorten the space required for them. The same idea could work for mech equipment.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Electrical  ·  Admin →
  15. Be able to change a one-line device block

    Be able to take a block that I already inserted into my one-line and then change the actual block without re-inserting it.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Electrical  ·  Admin →
  16. Have Pipes Arrows Point in Flow Direction

    Have the option to specify which way pipes flow (toward fixtures or away) and have the arrows on the pipe drawn to match.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  17. Print Load Calculations: Have a Select All/Unselect All checkbox

    When printing load calculations, have a Select All/Unselect All check box. It's a bit tedious to do manually.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  HVAC  ·  Admin →
  18. Electrical elevation label

    Create a label that will display the elevation of a device and update automatically when the elevation changes.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    3 comments  ·  Electrical  ·  Admin →
  19. Batch Device Query

    Query multiple receptacles, light fixtures, low voltage devices and equipment at the same time, being able to edit properties of all selected.

    This would be useful for adding a special subscript note, or adding a custom load to a group of devices.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Electrical  ·  Admin →

    In the current release, the “Edit Multiple” commands can be used for this purpose. There is a separate command for each type of device.

    In the next release, we’ve upgraded the command to better list the values in the selected devices.

  20. 3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    3 comments  ·  Electrical  ·  Admin →