Skip to content

Design Master Wish List

Welcome to the Design Master Wish List, where you can submit your ideas for improvements to the software.

You can also browse ideas other users have submitted. The more comments, votes, and subscriptions we see for a feature, the more likely we are to implement it.



  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

155 results found

  1. Generic Schedule Creator

    Have a way to create a generic schedule. The schedule will be informational purposes only, but it will be generated the same way as the other DM schedules so it will look the same.

    29 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Add multiple circuits to a single piece of equipment (ie. HVAC) one for each load.

    Some HVAC and other pieces of equipment require multiple circuits for multiple loads inside each unit. Currently I have to create 2 pieces of equipment with the individual loads, overlay them, then circuit them.

    29 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Set Room Exhaust Rate

    Specify the exhaust air requirements for rooms and use these numbers in the load calculations and duct design calculations.

    27 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Improve Indoor Lighting Level Report

    Add "Allowed Watts / SF" as a field to rooms.

    Add "Allowed Watts / SF" and "Total Allowed Watts" as columns to the indoor lighting schedule.

    Add a "Totals" row at the bottom that totals the area, allowed watts, and computed watts.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Draw Circuit Loops Using Polylines instead of Arcs

    When you loop from one device to another, be able to select that loop and break it in to two loops that can each individually be moved or broke. This way we can have "S" loops.

    DM Note: When we implement this, it will probably be by allowing you to insert a loop using a pline. This will allow you to insert the loop however you want without any restrictions.

    20 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. 2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Create Separate One-Lines for Each LVD Group

    I have Security, F/A, Lighting Control Panels, Audio, and Data groups and would like to be able to create separate low voltage one-line risers for them.

    13 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Keep Tick Marks on Broken Circuits

    When a circuit is broken, keep tick marks inserted on one of the halves.

    10 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Photometric calculation schedule

    I would like to suggest that the photometric calculation schedule be a combined schedule for all rooms instead of a dedicated schedule for each single room/space (or both options be available). We are typically asked to provide a single schedule that lists the room/space name in the first column and then the various footcandle columns.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Allow diffuser tags to be moved and modified with standard AutoCAD editing commands.

    It would be helpful to not have to use the "special" DM commands to manipulate the diffuser tags.

    13 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Select automatic conduit based on Type

    When selecting conduit I want to be able to select the feeder as schedule 80 so that the only size option would be based on schedule 80. Then on another feeder I could select EMT for my circuits and the only option for auto sizing would be based on EMT. Finally, I would then have the option of adding the type to my one-lines and a conduit schedule.

    11 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Lighting loads - additional options

    I like the recent addition of the general lighting loads, but there are a couple of additional things that I would like to see related to that.

    1. I think that the calculated load should include the greater of the general lighting load or the connected lighting load. The NEC states that the values for the general lighting loads are minimum values and that they may not be adequate.

    Ok, so this is probably a low priority because the NEC values are pretty conservative. With the increased adoption of energy conservation codes it becomes less likely that the connected lighting load…

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Export schedules to excel

    My estimators are always asking me if they can get my fixture or panel schedules in an excel format.

    13 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Generator Load Calculations

    Calculate generator loads correctly, mostly by being able to specify that certain loads should not be included in the generator load.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Existing Loads & Metered Demand

    Include, in options, the ability to not include existing (layered) items in panel, feeder, and service calculations. I'd like to enter the load to keep track of it, but have the ability to exclude it from the load calculations since "existing" would be included in the metered demand load.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Dash in Empty Schedule Cells

    Include an option to print a "-" (a dash) in schedule cells if nothing is printed in them.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Equipment circuit label should be near the equipment symbol--not the equipment label.

    We often turn off printing of equipment label/leader, and use a keynote number with arrow instead. But we have to move the circuit to the equipment symbol, because it ends up under the equipment label (which we are not printing).

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Automatically Add "ON" prefix to homerun labels for which a homerun already exists.

    It is customary for circuits that are shared on opposite ends of a building or from one floor to the next to be identifed with multiple homerun symbols, with all but one of those homeruns labeled with "ON <Panel-Ckt>" rather than connecting with a loop. Currently, to do this, the homerun text itself must be modified, and this rarely works well because that text reverts back to the default <Panel-Ckt> text each time the circuits are updated.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Low-Voltage lighting systems - Transformers and light fixtures for 12 Volt and 24 Volt systems.

    Make possible not only the easy DM insertion of these devices onto the lighting plan but also the ability to account for these in the panel schedule and load calculations.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Add horsepower of individual loads on mcc schedules

    The MCC schedule doesn't have the ability to show horsepower values for the individual loads. This is important information for the MCC vendor for breaker and overload sizing.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Design Master Wish List

Categories

Feedback and Knowledge Base