Skip to content

Design Master Wish List

Welcome to the Design Master Wish List, where you can submit your ideas for improvements to the software.

You can also browse ideas other users have submitted. The more comments, votes, and subscriptions we see for a feature, the more likely we are to implement it.



  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

151 results found

  1. Room Peak Load Map

    It could be useful if there was a Load Calculation Map which indicated when a room peaked in cooling. Perhaps two maps, time of day and which month. It may be useful when determining the zoning.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  HVAC  ·  Admin →
  2. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Electrical  ·  Admin →
  3. Remove electrical equipment tag.

    I would like to be able to remove electrical equipment tags. Sometimes the plan is too crowded for the tags. In that case, a person could follow the circuit number to the panelboard schedule to see what something is.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Electrical  ·  Admin →
  4. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  HVAC  ·  Admin →
  5. Allow equipment callouts to be specified per equipment group, instead of globally

    It would be a great help to be able to choose an equipment callout to be tied to each equipment group instead of a single global selection. We use a different equipment tag for Kitchen equipment, Mechanical equipment, Shop equipment, etc.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Electrical  ·  Admin →
  6. Reverse Tick Marks

    Add a button to the "Insert Tick Marks" command to reverse the order of the tick marks in the dialog box.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Electrical  ·  Admin →
  7. Remove callouts from equipment connections

    Be able to remove a callout from a single piece of equipment on the drawing.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Electrical  ·  Admin →
  8. Merge Circuits

    Add the option to merge two circuits together.

    One of the circuits would end up as a space with nothing connected to it, no fixed loads, and no locked breaker or wire sizes.

    The other would have all of the devices that were originally connected to the two devices, the sum of the fixed loads from the two circuits, and all the fixed breaker and wire sizes from the two circuits.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Electrical  ·  Admin →
  9. Add sub-script option to Low-Voltage Devices

    Add the subscript option to Low-Voltage Devices.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Electrical  ·  Admin →
  10. Use actual room CFM from diffusers rather than calculated for ventilation calculation

    We are having issues with permits using the ASHRAE Ventilation calculation because DM is using the calculated CFMs instead of actual CFMs on plans. We are having to tweak all the load inputs and use minimum air flows to spit out correct CFMs in ventilation calculation. The loads have actual loads print out, so maybe this is an easy fix.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  HVAC  ·  Admin →
  11. Highlight Locked Duct Sizes

    We often need to lock a duct size or sizes for various reasons. After creating large sprawling duct systems, it is difficult to track these locked ducts so that we can check them when airflows change and resize them if necessary.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  HVAC  ·  Admin →
  12. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Electrical  ·  Admin →
  13. Separate hangers on their own layer for BIM modeling.

    Need to print various trades by color for coordination drawings. I think the hangers would be more legible if they could be a different color.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  General  ·  Admin →
  14. Maintain Tick Marks

    After circuits are inserted or circuit is modified in some way, the tick marks that were placed on multipole homerun circuits disappear and have to be re-inserted. It would be helpful for those tick marks to remain upon completion of circuit changes.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Electrical  ·  Admin →
  15. Add More Fields for Panel, Transformer, and Other One-Line Device Lists

    Add more fields, such as NEMA rating, and general schedule notes, for lists of one-line devices.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  1 comment  ·  Electrical  ·  Admin →
  16. Choosing VA instead of KVA (Panelboard Schedules)

    You've seen our panelboard schedules and it would be great to have the same options we show on ours to be able to show on the customized blocks in DM. Being able to display total VA of Left & Right phase and then total (Sum of both Left and Right in VA). Connected load total in VA. Being able to display Project name on Panel schedule. I love some of the options we don't show that I can include. So please keep what you have to add some more attributes.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Electrical  ·  Admin →
  17. Add Aluminum Wire Option

    With the price of copper so high we use aluminum wire for feeders on jobs that are over budget.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Electrical  ·  Admin →
  18. Different Connection Options for Different Types of Diffusers

    Have the "Diffuser Connection Settings" be able to be set based upon airflow type. For example, supply ducts always connect with flexible and return ducts connect with hard.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  HVAC  ·  Admin →
  19. Pressure Labels on Ductwork

    Add a button to label the pressure drop for a run of duct (the "Pressure Drop in this Section" value from the the "Query Duct" window). We use DM HVAC to do a lot of existing ductwork analysis for energy audits, etc., and we could really use a function that shows us how much pressure drop each section of the ductwork has, and the pressure drop for each fitting, in much the same format as the ductwork size labels currently appear.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  HVAC  ·  Admin →
  20. Universal update button

    This button would update all schedules, panels and one lines with one click. Currently going through each schedule option and then during review only finding out you missed one is agonizing. Update drawing and database does NOT do this.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  General  ·  Admin →
  • Don't see your idea?

Design Master Wish List

Categories

Feedback and Knowledge Base