Separate column in the feeder schedule for the service grounding electrode conductor.
The service ground does not get installed in the conduit with the service entrance conductors, so why is it shown just like all the other feeders where the equipment grounding conductor is installed with the feeder conductors. If you want the feature to show the GEC size, show it in a different column and show the feeder with no ground listed with the feeder conductors so its clear it is not in the conduit.