Skip to content

Design Master Wish List

Welcome to the Design Master Wish List, where you can submit your ideas for improvements to the software.

You can also browse ideas other users have submitted. The more comments, votes, and subscriptions we see for a feature, the more likely we are to implement it.



  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

90 results found

  1. Paralleling Switchgear Support

    Would be very helpful to be able to be able to have multiple sources connect to the same bus. We have had numerous situations where we have had Geneva type switches, multiple kirk-key input as well as paralleling switchgear situations where we were unable to find a "work-around" using this software. This is becoming especially common with ConEdison now permitting the paralleling of electrical sources.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Better default panel clearances

    Have better default values for panel clearances, including options to have it vary upon the panel defition.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. New and Existing Circuits / Breakers in Panel Schedule

    Be able to show new and existing circuits on different layers in a panel schedule. The existing circuits would be on a lighter layer and the new circuits would be on a darker layer. The rest of the schedule could be on either the new or existing layer.

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Demolition Layer Devices

    I do not feel that the schedules should show counts for devices like receptacles and computer outlets that are on a demolition layer.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Populate MCC Information Based upon Equipment

    The motor control center schedule includes several fields that could be populated from the information entered into the equipment connection devices. These include:

    Disconnect fuse size
    Starter NEMA size
    Starter type (ie, starter description)

    However, these fields do not populate automatically when the equipment connection devices are circuited to the motor control center. Is there a way to make the motor control center fields automatically pick this information from the equipment connection devices when they are circuited to a motor control center? Is there a way to override automatically populating the starter information into the motor control center when the…

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Size Transformer Feeders Differently than Other Feeders

    Allow transformer feeders to be sized using different size wires than other feeders. In particular, this would be for sizing 800A feeders. Normal panels can use 500kcmil wires, but transformers require 600kcmil.

    (The workaround for the moment is to use 500kcmil for your 800A automatic sizing and to manually size the transformers to 600kcmil.)

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Set number of spare breakers

    Add an option to require a set number of spare breakers on every panel. The other breakers in the panel would be listed as spaces.

    11 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Custom circuit description for spaces with no breakers

    Have a custom circuit description that is automatically used when the breaker size is set to "None" for a circuit.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Label homeruns with feeder IDs

    Label homeruns using feeder IDs like those used in the one-line diagram instead of full text wire callouts.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. On a one-line diagram, a vertical bus panel should have horizontal branch breakers--NOT vertical!

    When you generate a one-line diagram, if you have panels that have a vertical bus, their branch breakers end up at the bottom of the bus and are vertical. The look like main breakers--not branch breakers. A work around for this is for every vertical bus panel, generate a riser diagram starting with that panel. Even this work around is not perfect, as you have to resize the vertical bus and fiddle with the branch breaker.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Show schedule notes on last column when schedule is split

    Currently if a schedule has a "Maximum Schedule Height" set the schedule notes are placed at the bottom of the first column. It would be better to place them at the bottom of the last column (or at least have an option to place them there) since the last column is often shorter than the others.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Breaker Using Twice as Many Spaces

    Many breaker panels of old and of new has the ability to put a single, two, or three pole breaker in that takes twice as many spaces as normal. Example is I have a panel I have to represent that has a 2 pole breaker that takes position 36-38 and 40-42. It also has a 3 pole breaker in it that take 24-26,28-30,32-34. I have no way of circuiting the device and still have it on phase A, B, and C.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Multiple Switch Legs on a Single Switch

    Allow a single switch to have multiple switch legs associated with it. Currently we require a separate switch for each switch leg.

    13 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Backfeed Breakers

    Be able to use a branch breaker on the panel as the main breaker.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Set room boundaries to also be light-obstructing rectangles for photometric analysis

    It duplicates work to trace the boundaries of all rooms for energy analysis and circuit naming, then have to trace all the rooms again for photometric analysis. This would likely require the addition of a 'door' object to define places where light-obstructing boundaries would be ignored

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Support feeder calcs for track lighting

    See NEC 220.43(B). The connected load for the branch circuit is the sum of the wattage of the connected light fixtures. The demand load is an additional 150VA per foot. I would like a place to enter the number of feet of track on a branch circuit so the demand load is calculated correctly in the load summary. We currently accomplish this through a 'Variable Caclulated Load', but it might be more intuitive if there is a 'Length Variable Demand' option. Thank you.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Add Sections to Panels

    Define how many breakers are in each section of panel. This would be used when creating a 84 circuit panel that is made up of 2 sections, each with 42 circuits.

    For the panel schedule, include a separator between the sections.

    When circuiting, do not allow 2 or 3 pole circuits to span the two sections.

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Export the luminaire schedule into excel

    I have lighting reps ask me all the time for an excel spreadsheet of our luminaire schedule. It would be helpful to export our luminaire schedule into excel.

    9 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Fewer Tick Marks and Circuit Labels on Combined Homeruns

    Have an option for combined homeruns that will display tick marks and a circuit callout on the loop where the circuits change.

    For example, if you have a circuit like this:

    <-----(1)------(1)------(3)------(3)

    It would insert a circuit label and tick marks between the devices on circuit 1 and 3.

    P-1,3<-----(1)------(1)---3--(3)------(3)

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. RV Park and Marina Branch Circuit Calculations

    For RV Parks and Marinas, be able to model the pedestals or shore power receptacles as equipment connections, and use the feeder calculations on the branch circuits for breaker sizing and voltage drop purposes.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Design Master Wish List

Categories