Improve Dynamic Load Calculations
Make several modifications to fine tune the dynamic load calculations at the bottom of a panel schedule.
- Add the units of 'KVA' to the 'TOTAL LOAD'
- Change the units of the BALANCED LOAD line from 'A' to 'AMPS'
- Place the units for those two lines in the same column as the demand percentages of the rows above to make more room for the TOTAL LOAD and BALANCED LOAD sums to display without wrapping the units to the next line.
- Change the lines under CONN KVA and CALC KVA to the SCHEDULE-MEDIUM layer instead of the SCHEDULE-HEAVY layer.
1
vote
Solomon Williams
shared this idea